Pioneering
logistics.

Prime logistics development opportunity
on the southern M1 motorway.

Outline planning secured on a 200 acre site.

Development plots for sale.

Buildings available for sale
and to let from 40,000 - 1,500,000 sq ft.

MKEast Building

It starts at MKEast.

Milton Keynes East is set to become one of the UK's most significant logistics hubs.

Strategically positioned with unrivalled access to national transport networks, the development has been designed to meet the needs of a wide range of occupiers.

Development plots are available for sale, with buildings from 40,000 to 1,500,000 sq ft available for sale or to let.

With sustainability and future-ready infrastructure at its core, this prime logistics destination combines scale, connectivity, and flexibility. MK East creates an exceptional opportunity for businesses seeking to establish or expand within the heart of the UK’s supply chain network.

From East to West, North to
South. MKEast has it all.

Located within the UK’s highly desirable logistics Golden Triangle.

Map Pin

Space for everyone.

Designed for flexibility, every scale, sector, & scope
with an option for up to 1,504,000 sq ft.

Layout A
Layout B
Layout A Site Plan Layout B Site Plan
UNIT 1135,000 SQ FT12,542 SQ M
UNIT 2140,000 SQ FT13,006 SQ M
UNIT 350,000 SQ FT4,645 SQ M
UNIT 4452,000 SQ FT41,992 SQ M
UNIT 5472,000 SQ FT43,850 SQ M
UNIT 6552,000 SQ FT51,282 SQ M
UNIT 7352,000 SQ FT32,701 SQ M
UNIT 8115,000 SQ FT10,683 SQ M
UNIT 965,000 SQ FT6,038 SQ M
UNIT 10240,000 SQ FT22,296 SQ M
UNIT 11402,000 SQ FT37,347 SQ M
UNIT 1240,000 SQ FT3,716 SQ M
UNIT 1340,000 SQ FT3,716 SQ M
UNIT 14100,000 SQ FT9,290 SQ M
TOTAL3,155,000 SQ FT293,104 SQ M
UNIT 140,000 SQ FT3,716 SQ M
UNIT 2100,000 SQ FT9,290 SQ M
UNIT 3135,000 SQ FT12,542 SQ M
UNIT 4452,000 SQ FT41,992 SQ M
UNIT 51,504,000 SQ FT139,723 SQ M
UNIT 6302,000 SQ FT28,056 SQ M
UNIT 7115,000 SQ FT10,683 SQ M
UNIT 965,000 SQ FT6,038 SQ M
UNIT 10240,000 SQ FT22,296 SQ M
UNIT 11402,000 SQ FT37,347 SQ M
UNIT 1240,000 SQ FT3,716 SQ M
TOTAL3,395,000 SQ FT315,399 SQ M
Secure fenced yard areas

Secure, fenced
yard areas

Dock levellers and level access doors

Dock levellers and
level access doors

Up to 65m yards

Up to
65m yards

21MVA power secured

21MVA power
secured

Air conditioned office spaces

Air conditioned
office spaces

High quality hard and soft landscaping

High quality hard
& soft landscaping

Up to 29m to ridge

Up to
29m to ridge

FM2 50kN/m2 load flooring

FM2 50kN/m2
load flooring

Secure fenced yard areas

Secure, fenced
yard areas

Dock levellers and level access doors

Dock levellers and
level access doors

Up to 65m yards

Up to
65m yards

21MVA power secured

21MVA power
secured

Air conditioned office spaces

Air conditioned
office spaces

High quality hard and soft landscaping

High quality hard
& soft landscaping

Up to 29m to ridge

Up to
29m to ridge

FM2 50kN/m2 load flooring

FM2 50kN/m2
load flooring

Thoughtful design.

An environment where staff can feel valued, refreshed and connected.

Motion detecting LED lighting

Motion detecting
LED lighting

Employee public transport

Employee public
transport

Rainwater harvesting

Rainwater
harvesting

Target BREEAM Outstanding

Target BREEAM
Excellent

Target EPC A+

Target
EPC A+

Roof 10% PV panels

Roof 10% PV panels
(100% PV ready)

EV charging stations

EV charging
stations

Sustainable landscaping

Sustainable
landscaping

Outdoor staff wellness areas

Outdoor staff
wellness areas

10% roof lights installed

10% roof
lights installed

Cycle storage for each unit

Cycle storage
for each unit

Use of recycled site materials

Use of recycled
site materials

Solar shading to prevent overheating

Solar shading to
prevent overheating

Carbon offset programs

Carbon offset
programs

Noise pollution reduction measures

Noise pollution
reduction measures

9,400,000 sq ft of BREEAM Exemplar developments to date.

Our approach is based firmly on the grounds of delivering buildings of intrinsic low energy demands, and deliver them in the most efficient manner possible (UN Sustainable Goals).

An assessment of suitable low and zero carbon technologies will be carried out to determine the most appropriate options for your development. In addition, water conservation plays a vital role in achieving sustainable development.

Sustainable development

Find your route.

Location Map

Strategically positioned at M1 Junction 14, offers an unrivalled location at the heart of the UK's logistics network. This prime position provides businesses with seamless multimodal access across the UK and into Europe, including the Midlands and the high-value London and South East markets.

With 90% of the UK population is reachable within a 4.5-hour drive time, the location offers outstanding national coverage and connectivity.

Road Icon
M1 J140.1 Miles1 Min
Milton Keynes4.5 Miles10 Mins
Birmingham68 Miles70 Mins
London52 Miles90 Mins
Plane Icon
Luton22.9 Miles24 Mins
Heathrow52.6 Miles50 Mins
Birmingham56.1 Miles60 Mins
East Midlands66 Miles65 Mins
Train Icon
Milton Keynes5.1 Miles12 Mins
London Euston50.2 Miles56 Mins
Birmingham New St69.7 Miles64 Mins
Liverpool Lime St162 Miles112 Mins
Port Icon
Tilbury77 Miles75 Mins
London Gateway79.3 Miles80 Mins
Felixstowe114 Miles120 Mins
Immingham145 Miles150 Mins
Demographics Background

Full of opportunity.

Milton Keynes offers access to one of the UK's strongest logistics labour markets.

Its established industrial base provides a skilled workforce with warehousing and transport experience, while excellent transport links widen the recruitment pool. A younger-than-average population and ongoing growth ensure a steady pipeline of talent for the future.

Economic Activity
64.9%

Economic activity is
above UK average
of 58.6%.

Population
287,060

Immediate
population within
Milton Keynes.

Local Workers
20,665

Local people work in
transport, storage &
manufacturing.

Unemployment
5,900

People are unemployed
(3.9%), in line with the
national average.

Economic Activity
150,800

82.4% of the population
are economically active, above
the national average of 78.5%.

Weekly Wage
£788.80

Is the average weekly wage,
above the national average
of £729.60.

Development ready.

Infrastructure and power in place.

MK East is fully serviced and ready to build. Estate roads, drainage and utilities are already in place, with 21 MVA secured power and site-wide infrastructure delivered. This means a faster route from agreement to occupation and reduced delivery risk for your operation.

Landscaping & Amenity

Landscaping
& Amenity

Parks, open spaces &
landscaped areas.

Planning Consent

Planning
Consent

Outline planning
consent secured.

Strategic Highways

Strategic
Highways

Roads, junctions &
corridor upgrades.

New Bridges

New
Bridges

Crossings over the
M1 & River Ouzel.

Cycle & Pedestrian Paths

Cycle &
Pedestrian Paths

Further extensions &
connectivity changes.

Highway Realignments

Highway
Realignments

Improvements to
the A509.

Utilities & Services

Utilities &
Services

Power (21 MVA) & site-
wide services in place.

Drainage Works Complete

Drainage Works
Complete

Drainage infrastructure to
support the development.